This was the intersection of Truman Ave. and Thomas St. last Monday, May 2nd. A City contractor was preparing to open the street above an 80 ft. injection well for groundwater runoff that was drilled a while back.

They're back out there this morning ripping out the storm drain on our corner, destroying the sidewalk behind it, and perilously close to the piers holding up the porch on the front of the house.

I've been watching the operator of the front-end shovel deftly moving the large bucket into position, and clawing away cement, coral rock, and lots of dirt. They were supposed to be finished last week, but I'd say that there are still 2-3 days before they're finished. We'll be glad when they are.